Fire Safety

Tigo TS4-A-2F

Dedicated rapid shutdown device for 2 solar modules
TS4-A-2F
TS4-A-2F

Fire Safety

TS4-A-2F

Description

The Tigo TS4-A-2F is a reliable, cost effective rapid shutdown solution that meets the latest module level shutdown requirements, including NEC 2017/2020. The TS4-A-2F is both IEC and UL certified for global acceptance. It is UL PVRSS certified for connectivity with the largest network of inverters, many of which have a built in RSS transmitter. By connecting to two modules, the TS4-A-2F reduces labor time and enables 16% fewer connections on a 14 panel string compared to single channel MLPE.

Functions
  • Rapid Shutdown
Features and benefits
  • Single MLPE connects to 2 PV modules
  • IEC and UL certified
  • Meets US NEC rapid shutdown safety requirements
  • UL PVRSS certified with the largest network of inverters
  • up to 1400W (700W per channel)
  • 16-80V, up to 25A (per channel)
  • MC4 (standard) connectors
  • Snaps to module frame for easy mounting
  • Does not require ground wire
  • PLC communication
  • 25-year warranty
Configuration
2 modules per TS4
Required
RSS Transmitter

Additional resources

Videos

Downloads

To view all Tigo downloads, click here
Datasheets
Datasheet: TS4-A-2F (Fire Safety for 2 modules)
Technical Documentation
Quick Start Guide: TS4-F/2F with RSS Transmitters
Installation Manual: TS4-A-F, TS4-A-2F, RSS for Fire Safety (legacy RSS transmitters without PST)
Installation Manual: TS4-A-F, TS4-A-2F, and Rapid Shutdown System (RSS) Transmitters with PST
Application Note: Pure Signal Technology
Application Note: TS4-F & RSS Transmitter Troubleshooting Guide
Whitepaper: PV-OFF™ - Improving PV Safety
Marketing Materials
Case Study: Circuit Energy Solutions uses Tigo Green Glove program for 98kW rooftop install
Brochure / Flyer: Rapid Shutdown Solution SKU Sheet
Brochure / Flyer: Rapid Shutdown Solutions Brochure
Brochure / Flyer: Tigo Commercial & Residential Flyer - North America
Brochure / Flyer: Tigo Flyer - UL PV Rapid Shutdown Systems (PVRSS)
Brochure / Flyer: Tigo Green Glove Flyer
Case Study: Breaking Ground in PV Safety: Tigo Rapid Shutdown Installation in Spain

System diagram

Choose Tigo and maximize the ROI of your solar projects

Contact Sales