From the partner who installed the project, GI Energy: "This was a fairly simple project. Design challenges included ensuring Tigo optimizers were used on the correct panels and the best string configuration was used to maximize yield. Measuring shading effectively and creating realistic projections was set to ensuring the customers expectations were set and met accordingly." The project also includes a timer to run the hot water during peak solar production periods.
Equipment used:
Photos courtesy, GI Energy: https://gienergy.com.au/